快好知 kuaihz订阅看过栏目

 


construction phase造句
1. RUP's Construction phase is directed at managing schedule risk. 2. The cost control in the construction phase is the key for construction enterprises effectively control project cost control. 3. From the cantilever bridge construction phase data can be seen throughout the construction process of stress change entirely reasonable. 4. Ensure SHE compliance during design and construction phase and participating in desk and Hazop reviews. 5. By the Construction phase, with the technical risks effectively mitigated, the principal focus turns to the question "Can we get all the work done by the end of the phase?" 6. Ensure SHE compliance during design and construction phase and participating in desk top and Hazop reviews. 7. During the construction phase and operation phase, the stability of the bridge is in good. 8. For the remainder of the construction phase, it was clear sailing, since the technical solution was obviously robust and progress was fast. 9. Long Pipeline; Risk Management; Construction Phase; Fuzzy Aggregative Risk Assessment. 10. The quality of the construction phase to a large extent determined by quality control. 11. The project to the construction phase quality control for research themes in a more systematic research. 12. How to reasonably handle the construction phase and operation phase of stability is the key to ensure the safe operation of the bridge. 13. Monitor contractor compliance with applicable HSSE requirements during construction phase. 14. Supplementary quality assurance requirements for installation[/construction phase.html], inspection and testing of mechanical equipment and systems for the construction phase of nuclear power plants; Addenda. 15. As noted earlier, the peak level of effort for a coder is high in the Construction phase of each program branch. 16. The linear elastic stability of the bridge during the construction phase, completed bridge phase and operation phase are analysed. 17. This paper analyses the loads of SRC steel - reinforced concrete member in construction phase. 18. It will endanger worker's safety, at the same time change the bridge alignment of construction phase, or even damage the bridge if fatigue failure of temporary connection happens. 19. The two part wall ties allow the thick cavity wall insulation to be installed at a later construction phase.